Joint Rig Committee Renewables Marine Warranty Survey Endorsement

 

Joint Rig Committee

Renewables Marine Warranty Survey Endorsement

 

1)     Coverage under this Policy for project activities is conditional upon:

 

a.    a Marine Warranty Surveyor (MWS) Company or Companies being appointed by the Assured from the following panel: {insert names of MWS Companies below}

 

 

 

 

 

 

 

 

 

on or before _ _ / _ _ / 20 _ _ {insert date};

 

b.    the Code of Practice (COP) and Scope of Work (SOW) to be used by the MWS is the most recently issued JRC Renewables COP and SOW (unless a different project specific COP and/or SOW is specified below).  Any material change to the project will require a review of the SOW.

 

 

 

c.  a kick off meeting is required: Yes / No {select as appropriate};

 

d.  the issuance of the Certificates of Approval (COA) by the MWS as identified in the SOW specified in item 1)b. of this Endorsement.

 

2)     The Marine Warranty Survey shall be conducted in accordance with the COP specified in item 1)b. of this Endorsement.

 

3)     The COP and SOW are to be found on the “Technical Documents” section of the JRC page on the LMA website: www.lmalloyds.com/jointrig

 

4)     It is the duty of the Assured to ensure compliance with all recommendations, requirements or restrictions of the MWS within the specified timescales.   In the event of a breach of this duty, Underwriters shall not be liable for any loss, damage, liability or expense arising from or contributed to by such breach.

 

5)     The cost of the Marine Warranty Survey shall be borne by the Assured.

 

6)     Any expenses incurred to comply with the MWS’s recommendations shall be solely at the expense of the Assured.

 

7)     The MWS shall be free to consult with the Underwriters and provide them with any relevant information.

 

8)     Underwriters shall be entitled to receive a copy of any recommendations and/or reports and/or COA directly from the MWS.

 

 

 

JR2021-028A, JRC Renewables Warranty Survey Endorsement