Joint Rig Committee
Renewables Marine Warranty Survey Endorsement
1) Coverage under this Policy for
project activities is conditional
upon:
a.
a Marine Warranty Surveyor (MWS)
Company or Companies being appointed by the Assured
from the following panel: {insert
names of MWS Companies below}
![]()
![]()
![]()
![]()
on or before _ _ / _ _ / 20
_ _ {insert date};
b.
the Code of Practice (COP)
and Scope of Work (SOW)
to be
used by the MWS is the most
recently issued JRC Renewables COP and
SOW (unless a different project specific COP and/or SOW is specified below). Any material change to
the project will require a
review of the SOW.
![]()
c. a kick
off meeting is required: Yes / No {select as
appropriate};
d. the issuance
of
the Certificates of Approval
(COA) by the MWS as
identified in the SOW specified
in item 1)b. of this Endorsement.
2)
The Marine
Warranty Survey shall be conducted in accordance with the COP specified in item 1)b. of this Endorsement.
3)
The COP
and SOW are to be found
on the “Technical Documents” section of the JRC page on
the LMA website: www.lmalloyds.com/jointrig
4) It is
the duty
of
the Assured to ensure compliance with all recommendations, requirements or restrictions of the MWS within the
specified timescales. In the event of a breach of this duty,
Underwriters shall not be liable
for
any loss, damage, liability
or
expense arising from or contributed to by
such breach.
5)
The cost of the Marine
Warranty Survey shall
be
borne by the Assured.
6)
Any expenses
incurred to comply with the MWS’s recommendations shall be solely at the
expense of the Assured.
7)
The MWS
shall be free to
consult with the Underwriters and provide them with any relevant information.
8)
Underwriters
shall be entitled
to receive a copy of any recommendations and/or reports and/or COA directly from the
MWS.
JR2021-028A, JRC Renewables Warranty
Survey Endorsement